Football Grass

Projects

Hebi Technician College (Synthetic Grass-XXGRASS)

Editor:xinxu    2021.08.27

It is a full-time public higher vocational school established in April 2001. Its history can be traced back to 1959 and located in Henan. Beautiful environment, perfect facilities and convenient transportation.

Construction Process of synthetic grass for football field:

1.Test the flatness, slop and surface appearance of the site foundation.

2.Line(measurement), determine the position of each function point and line.

3.Lay artificial turf, move turf into the site and spread it along a side line and then put turf together with all-purpose glue and stick it to the connecting belt.

4.After all the artificial grass is glued together, comb it with a lawnbrush to stand up all the fallen grass.

5.Filling accessories. According to the specification of 4mx4m, the whole site should be placed. The quartz sand should be spread into the specified area according to the number of sand kilograms per square meter of different grass heights. Spread the quartz sand evenly and comb the grass lengthways and breadthwise by lawn brush. Then spread the rubber particles as the above way and comb artificial grass.

TO TOP
CONTACT US
Mob/WhatsApp: +86 15137103015
Home Product Service Contact